Designed in the mid-1960’s, this church by Le Corbusier was completed by José Oubrerie in 2006 who was a member of the original design staff. Construction started in 1973 but was halted in 1978 due to political conflicts. These drawings were made while looking at slides that my wife took when she visited it.
Site internet sur l’œuvre et les archives de l’architecte chilien Guillermo Jullian de la Fuente collaborateur de Le Corbusier de 1958 à 1965
https://guillermojullian.wordpress.com/
LikeLike