places I’ve drawn, but have not yet visited series: Le Corbusier’s (& José Oubrerie) L’eglise Saint-Pierre de Firminy

Designed in the mid-1960’s, this church by Le Corbusier was completed by José Oubrerie in 2006 who was a member of the original design staff. Construction started in 1973 but was halted in 1978 due to political conflicts. These drawings were made while looking at slides that my wife took when she visited it.

20130211-003142.jpg

1 thought on “places I’ve drawn, but have not yet visited series: Le Corbusier’s (& José Oubrerie) L’eglise Saint-Pierre de Firminy”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s